The First HIT Active-Aqua Project on the African Continent
We are proud to report on our new beautiful project in Morocco, which has been added to our list of references since October.
A new outdoor riding arena with the HIT Active-Aqua riding surface irrigation system was put into operation in Ravensburg
Last year, the HIT Active Stable for 20 horses was opened on the Roth family’s farm near Ravensburg (Baden-Württemberg). Recently,
A New Jumping Arena in Rancho Santa Fe, California
Here are a few photos of our latest project from the USA. The Footing Solutions team did a great job, as always, building a perfect riding arena with
A new riding hall equipped with HIT Active-Aqua watering system is taken into use
In Sweden there is a new riding hall that is equipped with HIT Active-Aqua underground watering system. The riding hall has a size of 1250 square meters.
A New Riding Hall in the South of California
Good start to the year – together with our partner Footing Solutions USA we’ve realized a great project in the south of California. A great riding arena was equipped with our HIT Active-Aqua drip irrigation system.
Underground Watering System was Recently Installed in a New Riding Arena in Sweden
In Sweden, not far from Stockholm a new riding arena was built. The arena has a square of 1330 m2
One More Riding Hall equipped with HIT Active-Aqua Watering System in Lienen
After a great riding hall, a round pen and a big outdoor arena were completed, there is now a forth equestrian facility equipped with HIT Active-Aqua underground watering that was built at Hof Löffeld in Lienen.
A New Riding Arena with HIT Active-Aqua Underground Watering was built at Waldhummelhof in the region of Donaueschingen
At the region of Donaueschingen in Baden-Württemberg there is a new great riding arena with the size of 25x50m that was built. The arena is an additional facility to the already existing great HIT-Active Stable and a riding hall equipped with
HIT Active-Aqua Watering System Installation in Verden is Almost Complete
Making the base ready, irrigation system installation, laying the riding surface – all this within 3 months only!
A New Equestrian Arena in Lienen, Equipped with HIT Active-Aqua
There is a new outdoor arena, that’s been built at Hof Löffeld in Lienen. Last year an indoor arena and a lounging ring were already equipped with HIT Active-Aqua underground watering there, now