Making the base ready, irrigation system installation, laying the riding surface – all this within 3 months only! It’s impressive to see, how fast this big project was conducted at the racecource in Verden by Bohlmann Reitböden Company. All in all there are 3 new HIT Active-Aqua riding arenas with a total area of 15 000 square meters there.
The project was realized with a lot of dedication and many afterhours. Many thanks to the technicians and to everyone who took part in installation and contributed to this great project! 🙂 🙂