Again a new riding arena watering in Sweden

There is a neu riding hall (1820 sq.m) with automatic watering system that’s been built in Billinge. With HIT Active-Aqua System you can arrange watering intervals. Irrigation process starts automatically, without interfering the riders in the hall.
We’d like to thank Expara and to congratulate on this great new project!

Installing the irrigation pipes in the drain grids
Laying the drain grids
Delivery of the riding surface

Some more cool projects