A new riding arena equipped with HIT-Active Aqua in Lienen

There is a new outdoor arena, that’s been built at Hof Löffeld in Lienen. After the riding hall and a round pen were equipped with HIT-Active Aqua last year, the 40×60 m outdoor arena has now followed suit.

Since mainly first-class sport horses are kept and trained at the equestrian centre, the riding surface quality and good riding conditions are the main focus. With HIT-Active Aqua, the riding surface meets the highest standards.

We wish all the best with the new arena!

After Preparing the Base Course, the HIT DrainGrid Grids are Laid
PP-Fabric as Water-Permeable Separating Layer
HIT DrainGrid Grids can be Stacked on Each Other, which Saves Transport Costs.
Installation of the HIT-Active Aqua riding arena irrigation system
The Water Pipes must be Planned and Laid in Advance
The Surface Layer is Distributed on the Grids
An Important Component of the Underground Watering System is the Capillary Sand for the Arena Footing

Some more cool projects