
Making the base ready, irrigation system installation, laying the riding surface – all this within 3 months only! Read More
Making the base ready, irrigation system installation, laying the riding surface – all this within 3 months only! Read More
There is a new outdoor arena, that’s been built at Hof Löffeld in Lienen. Last year an indoor arena and a lounging ring were already equipped Read More
At Danielshof in Igelsberg there is a nice new facility of HIT Active Stable for 60 horses, that is being built. Read More
Neither coronavirus crisis nor snow in the end of March could prevent us from building a new riding arena with HIT Active-Aqua Read More
We had a pleasure to build a riding arena with HIT Active-Aqua underground watering system in one of the most beautiful winery areas of California Read More